Measured
in microns.
A grease-depth reading at every access point opened, before and after works — reported as numbers against the AIRAH Best Practice Guideline benchmark, not as adjectives.
The whole system — canopy, filters, plenum, ductwork, riser and fan — maintained on a planned interval program and certified to AS 1851-2012 with the measurements on the page.
A grease-depth reading at every access point opened, before and after works — reported as numbers against the AIRAH Best Practice Guideline benchmark, not as adjectives.
Every position re-shot after works from the identical position and framing, one label per pair — comparable evidence, not two unrelated pictures.
Whether the whole system was serviced or only part of it is written on the certificate before anyone asks, with every unreached section listed and the reason.
Missing access panels, sections beyond criteria, damaged ductwork — each listed with location, severity, a photo reference and a recommended action.
Your interval is set from the measured accumulation between services and written on the certificate. The obligation never floats.
Start with a 15–30 minute site survey — the same instruments and the same evidence discipline as the certificate, on your own kitchen.